Window compliance relies on correct product selection and installation. Confirming glazing, safety features and drainage details before ordering helps prevent safety risks, water damage and costly rectification.
Before approving the window schedule, review the project’s applicable NCC requirements with the designer and supplier, including:
These checks also apply to imported windows, which must meet the same applicable Australian requirements as locally manufactured products. A sticker claiming glazing compliance does not, by itself, demonstrate compliance of the complete window assembly. Obtain verifiable testing and compliance documentation covering the actual system, sizes and configurations being supplied, including evidence relevant to AS 2047 and AS 1288. Overseas certification should not be assumed to demonstrate Australian compliance.
Drainage details need the same attention before ordering. Ask the supplier to show where the frame’s drainage holes discharge and how the window, subsill or sill flashing, wall membrane and external cladding will work together to carry water outside.
Downward-facing drainage holes require a compatible installation detail that collects and directs water to the exterior. Water should not discharge uncontrolled into the cavity or onto framing, insulation or internal finishes. The presence of drainage holes alone does not establish a suitable installation.
During installation, check flashing continuity, required subsill end dams and drainage clearances. Keep outlets clear of sealant, mortar, render and cladding. Retain the compliance documentation and photograph flashing and drainage details before they are concealed.