Get in contact with Master Builder ACT using the form or any of the contact details below.
Become a Member Need help?
Latest News

Hot Water System Drainage Requirements

Posted
Members are reminded that relief valve drain lines from hot water systems, including heat pump systems, must terminate at a suitable discharge location in accordance with AS/NZS 3500.4 – Plumbing and Drainage (Heated Water Services).
Discharging directly onto concrete paths or slabs, without an appropriate drainage arrangement, is not an acceptable termination method under the standard. Suitable termination points include an overflow relief gully, disconnector gully, gravel pit or suitable unpaved surface, subject to the prescribed clearances and installation requirements.
Heat pump condensate drainage must also be installed in accordance with the manufacturer’s installation instructions. Builders and plumbers are encouraged to review these installations prior to handover to ensure compliance and prevent slip hazards, water ponding, staining and potential moisture-related damage to adjoining building elements.